George Killen went on to Perform a vital position in the ultimate phases of design with the release of cables for The 2 sides to be a part of. (Equipped: Liz Killen)Michael Killen suggests all of the staff have earned recognition for their contribution to such a magnificent achievement in making the bridge.Kenneth was picked from the Melbourne Her